BUILDING DRIVEWAYS THAT WILL LAST
At Dan's we carefully procure quality materials that meet our high-quality standards and optimize the lifetime of driveways constructed by Dan's Paving.
OUR FOUR STEP PROCESS
To build a quality driveway, proper time and attention to detail are required throughout the four-step process:
STEP 1: Old blacktop, stone or topsoil is removed and replaced with a layer of crushed stone, known as sub-base.
STEP 2: The sub-base is then compacted with a vibratory roller. After the compaction process, a sub-base of 6 to 8 inches deep is left. This material is applied directly on the sub-soil surface.
STEP 3: A layer of binder blacktop is added between the sub-base and the wearing course (this is recommended for highly traveled driveways and parking lots). The binder is then compacted to a thickness of about two inches.
STEP 4: Finally, the wearing coarse is applied and compacted. The thickness of the asphalt can vary from 1 1/2 inches to 2 1/2 inches depending on the binder course application.
Depending on weather conditions your driveway will be cured and ready for use within 1 to 3 days from completion.
For a complimentary consultation and estimate, please contact us at 978-342-4832.
"Couldn't be happier with our new driveway. We made last minute changes and they got it done without a problem. Our driveway was widened and they reduced the grade. We got immediate responses to our calls/questions. We've had numerous compliments. Our driveway looks amazing. Yes I would recommend Dan's."
- Annmarie G.
RESIDENTIAL & COMMERCIAL
FITCHBURG, MA 01420
Powered by Artificial-Intelligence
CALL US: 978-342-4832